Due to gravity an accumulation
of melting material at the bottom of the stud can occur when welding
vertical work pieces.
Remedial measures against accumulation of melting material :
• Install earth cables only underneath the welding point. Due to
the blowing action – desired in this case – the melting is kept at the
top.
• Adapt stud protrusion.
|